OUR RETIREMENT HOME

We started construction of our vacation home in 1986. It took 6 years to complete the home as we oversaw the construction on a part time basis and with the help of our relatives. Once we retired full time to México, it became our retirement home and we did a major remodel and repainted the home. Our home has 3 bedrooms and 3 1/2 baths. A 4th bedroom with another 1/2 bath is used as a storeroom. The house has a lower patio and an upper deck area. It is located 1 1/2 blocks from the town plaza.

Casa 0405EN1HGarage1

Above Left: Our Home ++ Above Center: Entry/Garage ++ Above Right: Entry/Garage
Below Left: Kitchen ++ Below Center and Below Right: Dining Area

KitchenRHDR20203RHDR10203

RHLR0203RHLR0303RHLR30203

Above: Living Room
Below: Master Bedroom

RHMB0603RHMB20603RHMB10603

RHFB10203RBR1HFM3H

Above Left: Upper Front Bedroom ++ Above Center: Upper Rear Bedroom ++ Above Right: Family Room
Below Left and Center: Family Room ++ Below Right: Upper Rear Deck

FamilyRoom21203FamilyRoom41203Deck4

UD3HRHLP0203Patio6

Above Left: Upper Rear Deck ++ Above Center and Right: Lower Patio
Below: Lower Patio

RHLP80203RHLP100203RHLP10203

brrdrRETURN TO INDEX